Scorecard2010

From Delivery Wiki
Jump to navigation Jump to search

Past scorecards can be found here.

ISAC RIB (2010)

Schedule 117

Target Dates Experiment

number

Title Facility Pass Fail Incomplete

HP Ta #31
TM3/ITW

03/27–03/30 Development 28–32Al beams with TRILIS Yield
03/30–04/06 S1155 Ground State Moments of 11Li

NOTE: 8,9Li delivered successfully; 11Li rate less than required

β-NQR
04/07–04/12 M1226 Beta-NMR investigation of the magnetism at the interface between insulating SrTiO3 and LaAlO3

NOTE: Significant downtime due to power bump and cyclotron problems.

β-NQR
04/12–04/14 Development 110–117Ag beam development with TRILIS Yield
04/14–04/20 S1007 Equilibrium of 115mCd during the s-process

NOTE: Run ended early due to ionizer tube failure.

04/20–04/23 S984 Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82 CANCELLED—ionizer tube failure X
04/23–04/27 M1153 Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers CANCELLED—ionizer tube failure β-NMR X

HP Ta #32
TM4/ITE

05/03–05/12 S1147 Investigation of low-lying resonances in 11Li TUDA-II
05/12–05/14 Development TRILIS east path development Yield
05/14–05/18 S1203 Spectroscopy of 12Li CANCELLED—target startup delayed by cyclotron problems; S1147 extended to completion TUDA-II X
05/19–05/25 βNMR TBA βNMR
05/25–05/31 S1142 Study of two-phonon octupole excitations in 146Gd from the decays of 146Tb isomers CANCELLED BY SCIENCE DIVISION—isobaric contaminant