Scorecard2010

From Delivery Wiki
Jump to navigation Jump to search

Past scorecards can be found here.

ISAC RIB (2010)

Schedule 117

Target Dates Experiment

number

Title Facility Pass Fail Incomplete

HP Ta #31
TM3/ITW

03/27–03/30 Development 28–32Al beams with TRILIS Yield
03/30–04/06 S1155 Ground State Moments of 11Li

NOTE: 8,9Li delivered successfully; 11Li rate less than required

β-NQR
04/07–04/12 M1226 Beta-NMR investigation of the magnetism at the interface between insulating SrTiO3 and LaAlO3

NOTE: significant downtime due to power bump and cyclotron problems

β-NQR
04/12–04/14 Development 110–117Ag beam development with TRILIS Yield
04/14–04/20 S1007 Equilibrium of 115mCd during the s-process

NOTE: run ended early due to ionizer tube failure

04/20–04/23 S984 Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82 CANCELLED—ionizer tube failure X
04/23–04/27 M1153 Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers CANCELLED—ionizer tube failure β-NMR X

HP Ta #32
TM4/ITE

05/03–05/1217 S1147 Investigation of low-lying resonances in 11Li

NOTE: run extended due to cyclotron problems; rates well above agreed minimum

TUDA-II
05/12–05/1419 Development TRILIS east path development

NOTE: delayed to accommodate extended S1147 run

Yield
05/14–05/18 S1203 Spectroscopy of 12Li CANCELLED—target startup delayed by cyclotron problems; S1147 extended to completion TUDA-II X
05/19–05/2531 βNMR Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers (M1153); 8Li Investigation of Spin Transport through Ferromagnet-Semiconductor (M1176); Investigation of the Magnetic Proximity Effect by 8Li βNMR (M1165) βNMR
05/25–05/31 S1142 Study of two-phonon octupole excitations in 146Gd from the decays of 146Tb isomers CANCELLED BY SCIENCE DIVISION—isobaric contaminant