Scorecard2010

From Delivery Wiki
Jump to navigation Jump to search

ISAC RIB (2010)

Schedule 117

Target Dates Experiment

number

Title Facility Pass Fail Incomplete

HP Ta #31
TM3/ITW

03/27–03/30 Development 28–32Al beams with TRILIS Yield
03/30–04/06 S1155 Ground State Moments of 11Li β-NQR
04/07–04/12 M1226 Beta-NMR investigation of the magnetism at the interface between insulating SrTiO3 and LaAlO3 β-NQR
04/12–04/14 Development 110–117Ag beam development with TRILIS Yield
04/14–04/20 S1007 Equilibrium of 115mCd during the s-process [NOTE: run ended early due to ionizer tube failure]
04/20–04/23 S984 Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82 CANCELLED—ionizer tube failure X
04/23–04/27 M1153 Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers CANCELLED—ionizer tube failure β-NMR X