TRIUMF contacts
Jump to navigation
Jump to search
Science Division
- Science Division office – e-mail (New experiment numbers, etc.)
- Administrative Assistant – Nicole Martin
- Division Head – Reiner Kruecken
Computing
- IT Services – website
- All requests for computing services (user IDs, accounts, etc.) should be made through the TRIUMF HelpDesk.
Nuclear Medicine Division
- Division Head - Jean-Michel Poutissou
Support groups
Accelerator Operations
- 500 MeV Cyclotron Operations Coordinator – Jamie Cessford
- ISAC Operations Coordinator – Violeta Toma
- TR13 PET Operations Coordinator – Conny Hoehr
Detectors
- Detector Group Leader – Andy Miller
- Engineering/Construction – Robert Henderson
- Vacuum chambers – Wayne Faszer
- Gas handling – Robert Openshaw
- Instrumentation – Grant Sheffer
Data acquisition and analysis
- Data Acquisition Group Leader – Pierre Amaudruz
- Counting rooms – Meson Hall coordinator: Grant Sheffer; ISAC coordinator: Pierre Amaudruz
General support
- Infrastructure – Curtis Ballard (Group Leader, Site Maintenance Services), Doug Preddy (Group Leader, Beamlines Support)
- Engineering and design – Remy Dawson (Division Head, Engineering)
- Safety approval – Reiner Kruecken (Division Head, Science)
- Beam delivery – Colin Morton (Acting Group Leader, Beam Delivery)
Meson Hall
Beamline, channel and facility coordinators
- M9B - Syd Kreitzman
- M11 - see Gordon Ball
- M13 - see Gordon Ball
- M15 - Syd Kreitzman
- M20 - Syd Kreitzman
- PIF & NIF (Proton and Neutron Irradiation Facilities) - Mike Trinczek
- STF (Solid Target Facility) - David Pearce
- 500 MeV Irradiation Facility - Rene Van den Elzen
ISAC
- Targets, ion sources and radioactive ion beam development - Pierre Bricault, Marik Dombsky, Jens Lassen
- Front end and low-energy beam delivery - Friedhelm Ames, Colin Morton
- Accelerators and high-energy beam delivery - Marco Marchetto, Bob Laxdal
- Beam liaison - Colin Morton
The ISAC Facility at TRIUMF has two experimental halls with a diverse range of Experimental Facilities and Research Groups.
Each facility has a TRIUMF-based Coordinator who is responsible for the safe operation of the facility and will act as a User and Visitor liaison.
Interested scientists should contact the appropriate Coordinator from the lists below to obtain more information.
ISAC low-energy experimental facilities
- Collection Station - Coordinator: Friedhelm Ames
- TRINAT - Coordinator: John Behr
- 8π - Coordinator: Adam Garnsworthy
- GPS1, GPS2, GPS3 general purpose stations - Coordinator: Gordon Ball
- Laser Spectroscopy - Coordinator: Matt Pearson
- Polarizer - Coordinator: Phil Levy
- βNMR and βNQR - Coordinator: Gerald Morris
- Osaka - Coordinator: Phil Levy, Matt Pearson
- TITAN - Coordinator: Jens Dilling
ISAC-I (accelerated) experimental facilities
- DRAGON - Coordinator: Chris Ruiz
- TUDA - Coordinator: Pat Walden
- HEBT-GPS General Purpose Station - Coordinator: Gordon Ball
ISAC-II experimental facilities
- HERACLES (Under construction) - Coordinator: Dave Ottewell
- SEBT2 general purpose station - Coordinator: Barry Davids
- TIGRESS - Coordinator: Greg Hackman
- EMMA (Under construction) - Coordinator: Barry Davids
- TUDA-II - Coordinator: Pat Walden