21:56, 7 April 2009 (PDT)

Right now, the cyclotron is delivering 40 µA to ISAC and < 1µA to PIF. There's no maintenance scheduled for tomorrow, so things should continue like this through the weekend.

At ISAC, 11Be is being delivered to β-NMR for a polarizer test. Sophia is setting up the accelerators with 20Ne for this weekend's TIGRESS 10Be run. Tomorrow should be more of the same, with stable beam tuning through the TIGRESS vacuum chamber in the afternoon or evening. We'll switch to delivering 10Be to TIGRESS on Thursday.

Morton