Scorecard2010: Difference between revisions

From Delivery Wiki
Jump to navigation Jump to search
Line 125: Line 125:
| <del>05/25–05/31</del>
| <del>05/25–05/31</del>
| <del>S1142</del>
| <del>S1142</del>
| <del>Study of two-phonon octupole excitations in <sup>146</sup>Gd from the decays of <sup>146</sup>Tb isomers</del> ''CANCELLED by Science Division—isobaric contaminant''
| <del>Study of two-phonon octupole excitations in <sup>146</sup>Gd from the decays of <sup>146</sup>Tb isomers</del> ''CANCELLED BY SCIENCE DIVISION—isobaric contaminant''
| <del>8π</del>
| <del>8π</del>
|
|

Revision as of 13:10, 1 June 2010

Past scorecards can be found here.

ISAC RIB (2010)

Schedule 117

Target Dates Experiment

number

Title Facility Pass Fail Incomplete

HP Ta #31
TM3/ITW

03/27–03/30 Development 28–32Al beams with TRILIS Yield
03/30–04/06 S1155 Ground State Moments of 11Li β-NQR
04/07–04/12 M1226 Beta-NMR investigation of the magnetism at the interface between insulating SrTiO3 and LaAlO3

NOTE: Significant downtime due to power bump and cyclotron problems.

β-NQR
04/12–04/14 Development 110–117Ag beam development with TRILIS Yield
04/14–04/20 S1007 Equilibrium of 115mCd during the s-process

NOTE: Run ended early due to ionizer tube failure.

04/20–04/23 S984 Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82 CANCELLED—ionizer tube failure X
04/23–04/27 M1153 Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers CANCELLED—ionizer tube failure β-NMR X

HP Ta #32
TM4/ITE

05/03–05/12 S1147 Investigation of low-lying resonances in 11Li TUDA-II
05/12–05/14 Development TRILIS east path development Yield
05/14–05/18 S1203 Spectroscopy of 12Li CANCELLED—target startup delayed by cyclotron problems; S1147 extended to completion TUDA-II X
05/19–05/25 βNMR TBA βNMR
05/25–05/31 S1142 Study of two-phonon octupole excitations in 146Gd from the decays of 146Tb isomers CANCELLED BY SCIENCE DIVISION—isobaric contaminant