Scorecard2010: Difference between revisions
Jump to navigation
Jump to search
(New page: ==ISAC RIB (2010)== ===Schedule 117=== {| class="wikitable" style="color:black;background-color:#eeeeee;" cellpadding="10" cellspacing="0" border="1" ! Target ! Dates ! Experiment number ...) |
|||
Line 64: | Line 64: | ||
| <del>04/20–04/23</del> | | <del>04/20–04/23</del> | ||
| <del>S984</del> | | <del>S984</del> | ||
| <del>Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82</del> | | <del>Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82</del> CANCELLED—ionizer tube failure | ||
| <del>8π</del> | | <del>8π</del> | ||
| | | | ||
Line 73: | Line 73: | ||
| <del>04/23–04/27</del> | | <del>04/23–04/27</del> | ||
| <del>M1153</del> | | <del>M1153</del> | ||
| <del>Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers</del> | | <del>Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers</del> CANCELLED—ionizer tube failure | ||
| <del>β-NMR</del> | | <del>β-NMR</del> | ||
| | | |
Revision as of 12:55, 23 April 2010
ISAC RIB (2010)
Schedule 117
Target | Dates | Experiment
number |
Title | Facility | Pass | Fail | Incomplete |
---|---|---|---|---|---|---|---|
HP Ta #31 |
03/27–03/30 | Development | 28–32Al beams with TRILIS | Yield | |||
03/30–04/06 | S1155 | Ground State Moments of 11Li | β-NQR | ||||
04/07–04/12 | M1226 | Beta-NMR investigation of the magnetism at the interface between insulating SrTiO3 and LaAlO3 | β-NQR | ||||
04/12–04/14 | Development | 110–117Ag beam development with TRILIS | Yield | ||||
04/14–04/20 | S1007 | Equilibrium of 115mCd during the s-process | 8π | ||||
X | |||||||
X |