Scorecard2009: Difference between revisions

From Delivery Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 113: Line 113:


|-
|-
| 05/22–06/01
| <del>05/22–06/01</del>
| S1123
| <del>S1123</del>
| Nova Observables (II) — <sup>18</sup>F abundance and the <sup>18</sup>F(p,γ)<sup>19</sup>Ne reaction
| <del>Nova Observables (II) — <sup>18</sup>F abundance and the <sup>18</sup>F(p,γ)<sup>19</sup>Ne reaction</del>
| DRAGON
| <del>DRAGON</del>
|
|
| align="center" style="background-color:#ffcccc" | &#x2713;<sup>3</sup>
| align="center" style="background-color:#ffcccc" | &#x2713;<sup>3</sup>
Line 132: Line 132:
|-
|-
|  
|  
HP ZrC <br>
<del>HP ZrC <br>
TM3/ITW
TM3/ITW</del>
| 06/05–06/23
| <del>06/05–06/23</del>
| S841
| <del>S841</del>
| Development
| <del>Development</del>
| Yield
| <del>Yield</del>
|
|
| align="center" style="background-color:#ffcccc" | &#x2713;<sup>4</sup>
| align="center" style="background-color:#ffcccc" | &#x2713;<sup>4</sup>
Line 224: Line 224:
HP Ta<br>
HP Ta<br>
TM4/ITE
TM4/ITE
| 08/21–08/26
| <del>08/21–08/26</del>
| S1155
| <del>S1155</del>
| Ground State Moments of <sup>11</sup>Li
| <del>Ground State Moments of <sup>11</sup>Li</del>
| β-NMR
| <del>β-NMR</del>
|
|
| align="center" style="background-color:#ffcccc" | &#x2713;<sup>6</sup>
| align="center" style="background-color:#ffcccc" | &#x2713;<sup>5</sup>
|
|


|-
|-
| 08/26–09/03
| <del>08/26–09/03</del>
| S1147
| <del>S1147</del>
| Investigation of low-lying resonances in <sup>11</sup>Li
| <del>Investigation of low-lying resonances in <sup>11</sup>Li</del>
| TUDA-II
| <del>TUDA-II</del>
|
|
| align="center" style="background-color:#ffcccc" | &#x2713;<sup>6</sup>
| align="center" style="background-color:#ffcccc" | &#x2713;<sup>6</sup>
Line 271: Line 271:
<sup>1</sup>The delivered <sup>11</sup>Be rate was sufficient; those of <sup>12,14</sup>Be were not.<br>
<sup>1</sup>The delivered <sup>11</sup>Be rate was sufficient; those of <sup>12,14</sup>Be were not.<br>
<sup>2</sup>The <sup>11</sup>Be rate was lower than expected due to a miscommunication between the experimenters and Beam Delivery.<br>
<sup>2</sup>The <sup>11</sup>Be rate was lower than expected due to a miscommunication between the experimenters and Beam Delivery.<br>
<sup>3</sup>Target failed to produce <sup>18</sup>F as required.<br>
<sup>3</sup>Cancelled.  Target failed to produce <sup>18</sup>F as required.<br>
<sup>4</sup>TM3 was not ready for use as scheduled.<br>
<sup>4</sup>Cancelled.  TM3 was not ready for use as scheduled.<br>
<sup>5</sup>The planned HP Ta target was not available (see below) so beam was delivered from the existing LP SiC target.  No <sup>11</sup>Li was available, but a measurement was made with <sup>9</sup>Li.<br>
<sup>5</sup>The planned HP Ta target was not available so beam was delivered from the existing LP SiC target.  No <sup>11</sup>Li was available, but a measurement was made with <sup>9</sup>Li.<br>
<sup>6</sup>Due to a series of failures, a HP Ta target was not available as scheduled.<br>
<sup>6</sup>Cancelled.  The planned HP Ta target was not available as scheduled.  The run was replaced with discretionary time on the preceding LP SiC target.<br>

Revision as of 21:08, 31 August 2009

In development.

ISAC RIB (2009)
Target Dates Experiment

number

Title Facility Pass Fail Incomplete
HP Al2O3/Nb

TM4/ITE

03/20–03/31 S1149 EURISOL High Power Oxide Target Test for 18Ne Production Yield

LP Ta
TM1/ITW

04/04–04/06 S1158 Precision Mass Spectrometry of Halo Nuclides TITAN 1
04/07–04/08 Test 11Be polarization test β-NMR 2
04/09–04/15 S1209 Study of 3N forces in 10Be through safe Coulomb-excitation measurements TIGRESS
04/17–04/22 S1127 Search for Exotic Particle Emission in the Decay of Trapped Isomers TRINAT
04/23–04/28 S984 Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82
04/29–05/01 S1192 Branching ratio and half-life measurement from the β+ decay of 19Ne
05/01–05/06 S841 Development (Sn beams with TRILIS) Yield

HP SiC
TM4/ITE

05/09–05/12 S841 Development Yield
05/12–05/20 S1195 Resonances in 19Ne with relevance to the astrophysically important 18F(p,α)15O reaction TUDA-II
05/22–06/01 S1123 Nova Observables (II) — 18F abundance and the 18F(p,γ)19Ne reaction DRAGON 3
05/25–05/31 S1192 Branching ratio and half-life measurement from the β+ decay of 19Ne

HP ZrC
TM3/ITW

06/05–06/23 S841 Development Yield 4

HP Ta
TM4/ITE

06/27–06/30 Test Detector development with accelerated 8Li TACTIC
06/30–07/07 Various Materials science studies with β-NMR β-NMR
07/10–07/15 S929 Octupole Deformation and Spin-Exchange Polarization of Odd-A Radon Isotopes: Toward Radon Electric Dipole Moment Measurements Rn-EDM
07/17–07/20 S1066 Electron Capture Branching Ratios for the Odd-Odd Intermediate Nuclei in Double-Beta Decay using TITAN TITAN

LP SiC
TM1/ITW

07/25–08/04 S1103 (α,p) Reactions in Type 1 X-ray Bursts: Time-Reversed Approach at ISAC-II TUDA-II
08/06–08/16 S1107 Nuclear Structure and Astrophysics Using (d,p) with n-rich Na Isotopes TIGRESS
08/21–08/27 S1155 Ground State Moments of 11Li β-NMR 5
08/27–08/31 Test 9Li(d,p)10Li (discretionary) TUDA-II

HP Ta
TM4/ITE

08/21–08/26 S1155 Ground State Moments of 11Li β-NMR 5
08/26–09/03 S1147 Investigation of low-lying resonances in 11Li TUDA-II 6
09/04–09/09 Various Materials science studies with β-NMR β-NMR
09/11–09/12 S1073 High Accuracy Mass Measurements for Superallowed Nuclear β-decay Emitters TITAN
09/12–09/14 S1112 Mass Measurement of Neutron-rich Isotopes Around N=34 TITAN

Experiments in italics were scheduled after the beginning of the running period.
1The delivered 11Be rate was sufficient; those of 12,14Be were not.
2The 11Be rate was lower than expected due to a miscommunication between the experimenters and Beam Delivery.
3Cancelled. Target failed to produce 18F as required.
4Cancelled. TM3 was not ready for use as scheduled.
5The planned HP Ta target was not available so beam was delivered from the existing LP SiC target. No 11Li was available, but a measurement was made with 9Li.
6Cancelled. The planned HP Ta target was not available as scheduled. The run was replaced with discretionary time on the preceding LP SiC target.