TRIUMF contacts: Difference between revisions
Jump to navigation
Jump to search
Line 71: | Line 71: | ||
==== ISAC low-energy experimental facilities ==== | ==== ISAC low-energy experimental facilities ==== | ||
*Collection Station | *Collection Station – [http://www.triumf.ca/profiles/3675 Friedhelm Ames] | ||
*Yield Station – | *Yield Station – [http://www.triumf.ca/profiles/4341 Peter Kunz] | ||
*[http://www.triumf.ca/ | *Polarizer – [http://www.triumf.ca/profiles/469 Phil Levy] | ||
*[http://bnmr.triumf.ca/ βNMR and βNQR] – http://www.triumf.ca/profiles/572 Gerald Morris] | |||
*8π | *8π – [http://www.triumf.ca/profiles/4193 Adam Garnsworthy] | ||
* | *GPS (general purpose station) – [http://www.triumf.ca/profiles/2722 Gordon Ball] | ||
* | *Osaka – [http://www.triumf.ca/profiles/2333 John Behr] | ||
*Radon EDM – [http://www.triumf.ca/profiles/3118 Matt Pearson] | |||
* | *[http://titan.triumf.ca/ TITAN] – [http://www.triumf.ca/profiles/2543 Jens Dilling] | ||
*[http://www.triumf.ca/welcome/trinat.html TRINAT] – [http://www.triumf.ca/profiles/2333 John Behr] | |||
*[http:// | *Francium Trap – [http://www.triumf.ca/profiles/2333 John Behr] | ||
* | *Laser Spectroscopy – [http://www.triumf.ca/profiles/3118 Matt Pearson] | ||
==== ISAC-I (accelerated) experimental facilities ==== | ==== ISAC-I (accelerated) experimental facilities ==== |
Revision as of 10:39, 12 April 2011
Science Division
- Science Division office – e-mail (New experiment numbers, etc.)
- Administrative Assistant – Nicole Martin
- Division Head – Reiner Kruecken
Computing
- IT Services – website
- All requests for computing services (user IDs, accounts, etc.) should be made through the TRIUMF HelpDesk.
Nuclear Medicine Division
- Division Head - Jean-Michel Poutissou
Support groups
Accelerator Operations
- 500 MeV Cyclotron Operations Coordinator – Jamie Cessford
- ISAC Operations Coordinator – Violeta Toma
- TR13 PET Operations Coordinator – Conny Hoehr
Detectors
- Detector Group Leader – Andy Miller
- Engineering/Construction – Robert Henderson
- Vacuum chambers – Wayne Faszer
- Gas handling – Robert Openshaw
- Instrumentation – Grant Sheffer
Data acquisition and analysis
- Data Acquisition Group Leader – Pierre Amaudruz
- Counting rooms – Meson Hall coordinator: Grant Sheffer; ISAC coordinator: Pierre Amaudruz
General support
- Infrastructure – Curtis Ballard (Group Leader, Site Maintenance Services), Doug Preddy (Group Leader, Beamlines Support)
- Engineering and design – Remy Dawson (Division Head, Engineering)
- Safety approval – Reiner Kruecken (Division Head, Science)
- Beam delivery – Colin Morton (Acting Group Leader)
Meson Hall
Beamline, channel and facility coordinators
- M9, M15, M20 – Syd Kreitzman (Group Leader, MMS Facility)
- M11 – Stan Yen
- M13 – Toshio Numao
- PIF & NIF (Proton and Neutron Irradiation Facilities) – Mike Trinczek (Facility Coordinator)
- STF (Solid Target Facility) – David Pearce
- 500 MeV Irradiation Facility – Rene Van den Elzen (Isotope Production and Operations Supervisor)
ISAC
- Targets/Ion Sources, radioactive ion beam development – Pierre Bricault (Group Leader), Marik Dombsky (ISAC Target Scientist), Jens Lassen (Laser Ion Source Spectroscopist)
- Front end and low-energy beam transport – Friedhelm Ames, Colin Morton
- Accelerators and high-energy beam transport – Marco Marchetto, Bob Laxdal
- Beam delivery – Colin Morton
ISAC comprises two experimental halls with a broad range of facilities.
Each facility has a local Facility Coordinator who is responsible for the safe operation of the facility and will act as a user and visitor liaison.
Interested scientists should contact the appropriate Coordinator from the lists below to obtain more information.
ISAC low-energy experimental facilities
- Collection Station – Friedhelm Ames
- Yield Station – Peter Kunz
- Polarizer – Phil Levy
- βNMR and βNQR – http://www.triumf.ca/profiles/572 Gerald Morris]
- 8π – Adam Garnsworthy
- GPS (general purpose station) – Gordon Ball
- Osaka – John Behr
- Radon EDM – Matt Pearson
- TITAN – Jens Dilling
- TRINAT – John Behr
- Francium Trap – John Behr
- Laser Spectroscopy – Matt Pearson
ISAC-I (accelerated) experimental facilities
- DRAGON - Coordinator: Chris Ruiz
- TUDA - Coordinator: Pat Walden
- HEBT-GPS General Purpose Station - Coordinator: Gordon Ball
ISAC-II experimental facilities
- HERACLES (Under construction) - Coordinator: Dave Ottewell
- SEBT2 general purpose station - Coordinator: Barry Davids
- TIGRESS - Coordinator: Greg Hackman
- EMMA (Under construction) - Coordinator: Barry Davids
- TUDA-II - Coordinator: Pat Walden