Scorecard2010: Difference between revisions
Jump to navigation
Jump to search
Line 15: | Line 15: | ||
|- | |- | ||
| rowspan=7 | | | rowspan=7 | | ||
HP Ta #31<br> | HP Ta #31<br> | ||
TM3/ITW | TM3/ITW | ||
| 03/27–03/30 | | 03/27–03/30 | ||
Line 55: | Line 55: | ||
| 04/14–04/20 | | 04/14–04/20 | ||
| S1007 | | S1007 | ||
| Equilibrium of <sup>115m</sup>Cd during the s-process | | Equilibrium of <sup>115m</sup>Cd during the s-process ''[NOTE: run ended early due to ionizer tube failure]'' | ||
| 8π | | 8π | ||
| | | | ||
| | | | ||
| | | align="center" style="background-color:#ffffcc" | – | ||
|- | |- | ||
| <del>04/20–04/23</del> | | <del>04/20–04/23</del> | ||
| <del>S984</del> | | <del>S984</del> | ||
| <del>Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82</del> CANCELLED—ionizer tube failure | | <del>Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82</del> ''CANCELLED—ionizer tube failure'' | ||
| <del>8π</del> | | <del>8π</del> | ||
| | | | ||
Line 73: | Line 73: | ||
| <del>04/23–04/27</del> | | <del>04/23–04/27</del> | ||
| <del>M1153</del> | | <del>M1153</del> | ||
| <del>Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers</del> CANCELLED—ionizer tube failure | | <del>Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers</del> ''CANCELLED—ionizer tube failure'' | ||
| <del>β-NMR</del> | | <del>β-NMR</del> | ||
| | | |
Revision as of 13:00, 23 April 2010
ISAC RIB (2010)
Schedule 117
Target | Dates | Experiment
number |
Title | Facility | Pass | Fail | Incomplete |
---|---|---|---|---|---|---|---|
HP Ta #31 |
03/27–03/30 | Development | 28–32Al beams with TRILIS | Yield | |||
03/30–04/06 | S1155 | Ground State Moments of 11Li | β-NQR | ||||
04/07–04/12 | M1226 | Beta-NMR investigation of the magnetism at the interface between insulating SrTiO3 and LaAlO3 | β-NQR | ||||
04/12–04/14 | Development | 110–117Ag beam development with TRILIS | Yield | ||||
04/14–04/20 | S1007 | Equilibrium of 115mCd during the s-process [NOTE: run ended early due to ionizer tube failure] | 8π | – | |||
X | |||||||
X |