TRIUMF contacts: Difference between revisions

From Delivery Wiki
Jump to navigation Jump to search
 
(78 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Science Division ==
== Beam-Delivery-Updates ==
 
It is highly recommended for anyone running an experiment at TRIUMF to subscribe to the beam-delivery-updates e-mail list. Timely updates on anything affecting the beam schedule are sent out to this list.
 
Subscribe here: http://lists.triumf.ca/mailman/listinfo/beam-delivery-updates
 
== Physical Sciences Division ==
   
   
*Science Division office – [mailto:sciencediv@triumf.ca e-mail] (New experiment numbers, etc.)
*Division office – [mailto:sciencediv@triumf.ca e-mail] (New experiment numbers, etc.)
*Administrative Assistant – [http://www.triumf.ca/profiles/3523 Nicole Martin]
*Associate Lab Director – [http://www.triumf.ca/profiles/2543 Jens Dilling]
*Division Head – [http://www.triumf.ca/profiles/4514 Reiner Kruecken]
*Administrative Assistant – [http://www.triumf.ca/profiles/7150 Allayne McGowan]


==== Computing ====
== Life Sciences Division ==


*IT Services – [http://it-services.triumf.ca/ website]
*Division office – [mailto:numed-division@triumf.ca e-mail] (New experiment numbers, etc.)
*All requests for computing services (user IDs, accounts, etc.) should be made through the [https://helpdesk.triumf.ca/ TRIUMF HelpDesk].
*Associate Laboratory Director – [http://www.triumf.ca/profiles/4427 Paul Schaffer]
*Administrative Assistant – [http://www.triumf.ca/profiles/7056 Gloria Botelho]


==Nuclear Medicine Division==
== Accelerator Division ==


* Division Head - [http://www.triumf.ca/profiles/655 Jean-Michel Poutissou]
*Associate Laboratory Director – [http://www.triumf.ca/profiles/6044 Oliver Kester]
*Administrative Assistant – [http://www.triumf.ca/profiles/4395 Silke Bergelt-Bruckner]


== Support groups ==
== Support groups ==
Line 18: Line 26:
==== Accelerator Operations ====
==== Accelerator Operations ====


* 500 MeV Cyclotron Operations Coordinator – [http://www.triumf.ca/profiles/129 Jamie Cessford]
* Deputy Department Head – [http://www.triumf.ca/profiles/3675 Friedhelm Ames]
* ISAC Operations Coordinator – [http://www.triumf.ca/profiles/2281 Violeta Toma]
* Manager – [http://www.triumf.ca/profiles/2281 Violeta Toma]
* TR13 PET Operations Coordinator – [http://www.triumf.ca/profiles/3928 Conny Hoehr]
 
==== Stable Sources ====


==== Detectors ====
* Group Leader – [http://www.triumf.ca/profiles/1262 Keerthi Jayamanna]


*Detector Group Leader – [http://www.triumf.ca/profiles/556 Andy Miller]
==== Science Technology ====
*Engineering/Construction – [http://www.triumf.ca/profiles/332 Robert Henderson]
*Vacuum chambers – [http://www.triumf.ca/profiles/239 Wayne Faszer]
*Gas handling – [http://www.triumf.ca/profiles/609 Robert Openshaw]
*Instrumentation – [http://www.triumf.ca/profiles/738 Grant Sheffer]


==== Data acquisition and analysis ====
*Department Head – [http://www.triumf.ca/profiles/3757 Fabrice Retiere]
*Engineering/construction – [http://www.triumf.ca/profiles/332 Robert Henderson]
*Development – [http://www.triumf.ca/profiles/3757 Fabrice Retiere]
*Electronics – [http://www.triumf.ca/profiles/3844 Leonid Kurchaninov]
*[http://daq-plone.triumf.ca/ Data Acquisition] – [http://www.triumf.ca/profiles/20 Pierre Amaudruz]
*Electronics development – [http://www.triumf.ca/profiles/71 Daryl Bishop]


*[http://daq-plone.triumf.ca/ Data Acquisition] Group Leader – [http://www.triumf.ca/profiles/20 Pierre Amaudruz]
==== Computing ====
*Counting rooms – Meson Hall coordinator: [http://www.triumf.ca/profiles/738 Grant Sheffer]; ISAC coordinator: [http://www.triumf.ca/profiles/20 Pierre Amaudruz]
 
*Core Computing and Networking – [http://ccn.triumf.ca/ website]
*All requests for computing services (user IDs, accounts, etc.) should be made through the [https://helpdesk.triumf.ca/ TRIUMF HelpDesk].


==== General support ====
==== General support ====


*Infrastructure – [http://www.triumf.ca/profiles/934 Curtis Ballard] (Group Leader, Site Maintenance Services), [http://www.triumf.ca/profiles/658 Doug Preddy] (Group Leader, Beamlines Support)
*Infrastructure – [http://www.triumf.ca/profiles/5004 Matt McClean] (Group Leader, Building Services), [http://www.triumf.ca/profiles/658 Doug Preddy] (Group Leader, Beamlines)
*Engineering and design – [http://www.triumf.ca/profiles/181 Remy Dawson] (Division Head, Engineering)
*Engineering and design – [https://www.triumf.ca/profiles/4744 Bill Richert] (Director, Engineering Services / Chief Engineer)
*Safety approval – [http://www.triumf.ca/profiles/4514 Reiner Kruecken] (Division Head, Science)
*Safety approval – [http://www.triumf.ca/profiles/2543 Jens Dilling] (ALD – Physical Sciences)
*Beam delivery – [http://www.triumf.ca/profiles/2360 Colin Morton] (Acting Group Leader)
*Beam delivery – [http://www.triumf.ca/profiles/3675 Friedhelm Ames] (Group Leader, Beam Delivery & Development)


== Meson Hall ==
== Meson Hall ==
Line 46: Line 58:
==== Beamline, channel and facility coordinators ====
==== Beamline, channel and facility coordinators ====


*M9, M15, M20 – [http://www.triumf.ca/profiles/425 Syd Kreitzman] (Group Leader, MMS Facility)
*M9, M15, M20 – [http://www.triumf.ca/profiles/425 Syd Kreitzman] (Department Head, MMS Facility)
*M11 – [http://www.triumf.ca/profiles/911 Stan Yen]
*M11 – [http://www.triumf.ca/profiles/3838 Isabel Trigger] (Research Scientist)
*M13 – [http://www.triumf.ca/profiles/603 Toshio Numao]
*[http://www.triumf.ca/pif-nif PIF, NIF, and TNF] (Proton and Neutron Irradiation Facilities and the Thermal Neutron Facility) – [http://www.triumf.ca/profiles/1740 Mike Trinczek] (Facility Coordinator, PIF/NIF)
*[http://www.triumf.ca/pif-nif PIF & NIF] (Proton and Neutron Irradiation Facilities)<!--- , including TNF (Thermal Neutron Facility) ---> – [http://www.triumf.ca/profiles/1740 Mike Trinczek] (Facility Coordinator)
*STF (Solid Target Facility) – [http://www.triumf.ca/profiles/2570 Steve Sapriken] (ATG Maintenance Coordinator)
*STF (Solid Target Facility) – [http://www.triumf.ca/profiles/637 David Pearce]
*500 MeV Irradiation Facility – [http://www.triumf.ca/profiles/2676 Gabriel Cojocaru] (Group Leader, ATG Cyclotron Operations)
<!--- *TNF (Thermal Neutron Facility) – [http://www.triumf.ca/profiles/637 David Pearce] --->
*UCN – [http://www.triumf.ca/profiles/1577 Larry Lee] (UCN Project Manager)
*500 MeV Irradiation Facility – [http://www.triumf.ca/profiles/827 Rene Van den Elzen] (Isotope Production and Operations Supervisor)


== ISAC ==
== ISAC ==
   
   
*Targets/Ion Sources, radioactive ion beam development - [http://www.triumf.ca/profiles/2052 Pierre Bricault] (Group Leader), [http://www.triumf.ca/profiles/200 Marik Dombsky] (ISAC Target Scientist), [http://www.triumf.ca/profiles/3371 Jens Lassen] (Laser Ion Source Spectroscopist)
*Off-Line Ion Source (OLIS), stable beams – [http://www.triumf.ca/profiles/1262 Keerthi Jayamanna] (Group Leader, Stable Sources)
*Front end and low-energy beam transport - [http://www.triumf.ca/profiles/3675 Friedhelm Ames], [http://www.triumf.ca/profiles/2360 Colin Morton]
*Targets/Ion Sources, radioactive ion beam development [http://www.triumf.ca/profiles/3675 Friedhelm Ames] (Group Leader, Beam Delivery & Development), [http://www.triumf.ca/profiles/4341 Peter Kunz] (Actinide Target and RIB Physicist), [http://www.triumf.ca/profiles/3371 Jens Lassen] (Laser Ion Source Spectroscopist)
*Accelerators and high-energy beam transport - [http://www.triumf.ca/profiles/3740 Marco Marchetto], [http://www.triumf.ca/profiles/447 Bob Laxdal]
*Front end and low-energy beam transport [http://www.triumf.ca/profiles/3675 Friedhelm Ames] (Group Leader, Beam Delivery & Development), [http://www.triumf.ca/profiles/4884 Suresh Saminathan] (Beam Physicist), [http://www.triumf.ca/profiles/4727 Brad Schultz] (Beam Delivery Physicist)
*Beam delivery - [http://www.triumf.ca/profiles/2360 Colin Morton]
*Accelerators and high-energy beam transport – [http://www.triumf.ca/profiles/4809 Olivier Shelbaya] (ISAC-I Linac Facility Coordinator, RIB Linac Beam Physicist), [http://www.triumf.ca/profiles/4827 Spencer Kiy] (ISAC-II Linac & Beamlines, Beam Delivery Coordinator)
*Experimental facility support – [http://www.triumf.ca/profiles/5222 Martin Alcorta] (Group Leader, Nuclear Science Specialist Group)
*Beam delivery – [http://www.triumf.ca/profiles/3675 Friedhelm Ames] (Group Leader, Beam Delivery & Development), [http://www.triumf.ca/profiles/4827 Spencer Kiy] (Beam Delivery Coordinator), [http://www.triumf.ca/profiles/4727 Brad Schultz] (Beam Delivery Physicist)


<!--- Place image of ISAC here.  Update image to reflect current Experimental Facilities and beamlines.  Get a 3D figure and decide how large a figure to offer and perhaps have it open in a new or pop-up window? --->
<!--- Place image of ISAC here.  Update image to reflect current Experimental Facilities and beamlines.  Get a 3D figure and decide how large a figure to offer and perhaps have it open in a new or pop-up window? --->
Line 71: Line 84:
==== ISAC low-energy experimental facilities ====
==== ISAC low-energy experimental facilities ====


*Collection Station - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=friedhelm+a+ames&server=admin Friedhelm Ames]
*Implantation Station [http://www.triumf.ca/profiles/4341 Peter Kunz]
*[http://www.triumf.ca/welcome/trinat.html TRINAT] - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=john+a+behr&server=admin John Behr]
*Yield Station – [http://www.triumf.ca/profiles/4341 Peter Kunz]
*8&pi; - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=adam+garnsworthy&server=admin Adam Garnsworthy]
*Polarizer – [https://www.triumf.ca/profiles/4366 Ruohong Li]
*GPS1, GPS2, GPS3 general purpose stations - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=gordon+c+ball&server=admin Gordon Ball]
*[http://bnmr.triumf.ca/ &beta;NMR and &beta;NQR] – [http://www.triumf.ca/profiles/572 Gerald Morris]
*Laser Spectroscopy - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=matthew+pearson&server=admin Matt Pearson]
*GRIFFIN – [http://www.triumf.ca/profiles/4193 Adam Garnsworthy]
*Polarizer - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=phil+levy&server=admin Phil Levy]
*GPS – [http://www.triumf.ca/profiles/4193 Adam Garnsworthy]
*[http://bnmr.triumf.ca/ &beta;NMR and &beta;NQR] - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=gerald+d+morris&server=admin Gerald Morris]
*OSAKA –  [http://www.triumf.ca/profiles/3118 Matt Pearson]
*Osaka - Coordinator:  [http://www.triumf.info/facility/directories/index.php?search=phil+levy&server=admin Phil Levy], [http://www.triumf.info/facility/directories/index.php?search=matthew+pearson&server=admin Matt Pearson]
*[http://titan.triumf.ca/ TITAN] [http://www.triumf.ca/profiles/4833 Anna Kwiatkowski]
*[http://titan.triumf.ca/ TITAN] - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=jens+dilling&server=admin Jens Dilling]
*[http://www.triumf.ca/welcome/trinat.html TRINAT] [http://www.triumf.ca/profiles/2333 John Behr]
*Francium Trap – [http://www.triumf.ca/profiles/2333 John Behr]
*Laser Spectroscopy – [http://www.triumf.ca/profiles/3118 Matt Pearson]


==== ISAC-I (accelerated) experimental facilities ====
==== ISAC-I (accelerated) experimental facilities ====


*[http://dragon.triumf.ca/ DRAGON] - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=ruiz&server=admin Chris Ruiz]
*HEBT general purpose location – [http://www.triumf.ca/profiles/4193 Adam Garnsworthy]
*[http://tuda.triumf.ca/ TUDA] - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=pat+walden&server=admin Pat Walden]
*[http://dragon.triumf.ca/ DRAGON] [http://www.triumf.ca/profiles/3268 Chris Ruiz]
*HEBT-GPS General Purpose Station - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=gordon+c+ball&server=admin Gordon Ball]
*[http://tuda.triumf.ca/ TUDA-I] [http://www.triumf.ca/profiles/3268 Chris Ruiz]
<!---*[http://tactic.triumf.ca/ TACTIC] - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=pat+walden&server=admin Pat Walden]--->


==== ISAC-II experimental facilities ====
==== ISAC-II experimental facilities ====


*[http://www.triumf.ca/tug/agm2000/HERACLES.html HERACLES] (<font color=red>Under construction</font>) - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=dave+ottewell&server=admin Dave Ottewell]
*SEBT general purpose location – [http://www.triumf.ca/profiles/5222 Martin Alcorta]
*SEBT2 general purpose station - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=barry+s+davids&server=admin Barry Davids]
*[http://tuda.triumf.ca/ TUDA-II] – [http://www.triumf.ca/profiles/5222 Martin Alcorta]
*[http://tigress.triumf.ca/ TIGRESS] - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=greg+hackman&server=admin Greg Hackman]
*DSL – [http://www.triumf.ca/profiles/5222 Martin Alcorta]
*[http://davids.triumf.ca/emma.htm EMMA] (<font color=red>Under construction</font>) - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=barry+s+davids&server=admin Barry Davids]
*IRIS – [http://www.triumf.ca/profiles/5222 Martin Alcorta]
*[http://tuda.triumf.ca/ TUDA-II] - Coordinator: [http://www.triumf.info/facility/directories/index.php?search=pat+walden&server=admin Pat Walden]
*[http://tigress.triumf.ca/ TIGRESS] [http://www.triumf.ca/profiles/3154 Greg Hackman]
*[http://davids.triumf.ca/emma.htm EMMA] [http://www.triumf.ca/profiles/3508 Barry Davids]
 
The official lists of facility coordinators are available on TRIUMF's documents server (TRIUMF Secure Access ID required):
*[https://documents.triumf.ca/docushare/dsweb/Get/Document-173590/TRIUMF%20Building%20Facility%20Management%20-%20Facility%20Hall%20Building%20Coordinators-20201008_Document-173590_Rel5v2.pdf TRIUMF Building and Facility  Management - Facility, Hall, and Building Coordinators]

Latest revision as of 10:40, 30 March 2021

Beam-Delivery-Updates

It is highly recommended for anyone running an experiment at TRIUMF to subscribe to the beam-delivery-updates e-mail list. Timely updates on anything affecting the beam schedule are sent out to this list.

Subscribe here: http://lists.triumf.ca/mailman/listinfo/beam-delivery-updates

Physical Sciences Division

Life Sciences Division

Accelerator Division

Support groups

Accelerator Operations

Stable Sources

Science Technology

Computing

  • Core Computing and Networking – website
  • All requests for computing services (user IDs, accounts, etc.) should be made through the TRIUMF HelpDesk.

General support

  • Infrastructure – Matt McClean (Group Leader, Building Services), Doug Preddy (Group Leader, Beamlines)
  • Engineering and design – Bill Richert (Director, Engineering Services / Chief Engineer)
  • Safety approval – Jens Dilling (ALD – Physical Sciences)
  • Beam delivery – Friedhelm Ames (Group Leader, Beam Delivery & Development)

Meson Hall

Beamline, channel and facility coordinators

ISAC

  • Off-Line Ion Source (OLIS), stable beams – Keerthi Jayamanna (Group Leader, Stable Sources)
  • Targets/Ion Sources, radioactive ion beam development – Friedhelm Ames (Group Leader, Beam Delivery & Development), Peter Kunz (Actinide Target and RIB Physicist), Jens Lassen (Laser Ion Source Spectroscopist)
  • Front end and low-energy beam transport – Friedhelm Ames (Group Leader, Beam Delivery & Development), Suresh Saminathan (Beam Physicist), Brad Schultz (Beam Delivery Physicist)
  • Accelerators and high-energy beam transport – Olivier Shelbaya (ISAC-I Linac Facility Coordinator, RIB Linac Beam Physicist), Spencer Kiy (ISAC-II Linac & Beamlines, Beam Delivery Coordinator)
  • Experimental facility support – Martin Alcorta (Group Leader, Nuclear Science Specialist Group)
  • Beam delivery – Friedhelm Ames (Group Leader, Beam Delivery & Development), Spencer Kiy (Beam Delivery Coordinator), Brad Schultz (Beam Delivery Physicist)
The ISAC Facility at TRIUMF. Click for larger view.


ISAC comprises two experimental halls with a broad range of facilities. Each facility has a local Facility Coordinator who is responsible for the safe operation of the facility and will act as a user and visitor liaison. Interested scientists should contact the appropriate Coordinator from the lists below to obtain more information.

ISAC low-energy experimental facilities

ISAC-I (accelerated) experimental facilities

ISAC-II experimental facilities

The official lists of facility coordinators are available on TRIUMF's documents server (TRIUMF Secure Access ID required):