Scorecard2010: Difference between revisions
Jump to navigation
Jump to search
Line 101: | Line 101: | ||
| Development | | Development | ||
| TRILIS east path development<br> | | TRILIS east path development<br> | ||
''NOTE: delayed to accommodate extended S1147 run | ''NOTE: delayed to accommodate extended S1147 run'' | ||
| Yield | | Yield | ||
| align="center" style="background-color:#ccffcc" | ✓ | | align="center" style="background-color:#ccffcc" | ✓ |
Latest revision as of 14:31, 1 June 2010
Past scorecards can be found here.
ISAC RIB (2010)
Schedule 117
Target | Dates | Experiment
number |
Title | Facility | Pass | Fail | Incomplete |
---|---|---|---|---|---|---|---|
HP Ta #31 |
03/27–03/30 | Development | 28–32Al beams with TRILIS | Yield | ✓ | ||
03/30–04/06 | S1155 | Ground State Moments of 11Li NOTE: 8,9Li delivered successfully; 11Li rate less than required |
β-NQR | – | |||
04/07–04/12 | M1226 | Beta-NMR investigation of the magnetism at the interface between insulating SrTiO3 and LaAlO3 NOTE: significant downtime due to power bump and cyclotron problems |
β-NQR | – | |||
04/12–04/14 | Development | 110–117Ag beam development with TRILIS | Yield | ||||
04/14–04/20 | S1007 | Equilibrium of 115mCd during the s-process NOTE: run ended early due to ionizer tube failure |
8π | – | |||
X | |||||||
X | |||||||
HP Ta #32 |
05/03–05/ |
S1147 | Investigation of low-lying resonances in 11Li NOTE: run extended due to cyclotron problems; rates well above agreed minimum |
TUDA-II | ✓ | ||
05/ |
Development | TRILIS east path development NOTE: delayed to accommodate extended S1147 run |
Yield | ✓ | |||
X | |||||||
05/19–05/ |
βNMR | Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers (M1153); 8Li Investigation of Spin Transport through Ferromagnet-Semiconductor (M1176); Investigation of the Magnetic Proximity Effect by 8Li βNMR (M1165) | βNMR | ||||