Scorecard2010: Difference between revisions

From Delivery Wiki
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 23: Line 23:
| <sup>28–32</sup>Al beams with TRILIS
| <sup>28–32</sup>Al beams with TRILIS
| Yield
| Yield
|
| align="center" style="background-color:#ccffcc" | &#x2713;
|
|
|  
|  
Line 30: Line 30:
| 03/30–04/06
| 03/30–04/06
| S1155
| S1155
| Ground State Moments of <sup>11</sup>Li
| Ground State Moments of <sup>11</sup>Li<br>
''NOTE: <sup>8,9</sup>Li delivered successfully; <sup>11</sup>Li rate less than required''
| β-NQR
| β-NQR
|
|
|
|
|
| align="center" style="background-color:#ffffcc" | –


|-
|-
Line 40: Line 41:
| M1226
| M1226
| Beta-NMR investigation of the magnetism at the interface between insulating SrTiO<sub>3</sub> and LaAlO<sub>3</sub><br>
| Beta-NMR investigation of the magnetism at the interface between insulating SrTiO<sub>3</sub> and LaAlO<sub>3</sub><br>
''NOTE: Significant downtime due to power bump and cyclotron problems.''
''NOTE: significant downtime due to power bump and cyclotron problems''
| β-NQR
| β-NQR
|
|
Line 59: Line 60:
| S1007
| S1007
| Equilibrium of <sup>115m</sup>Cd during the s-process<br>
| Equilibrium of <sup>115m</sup>Cd during the s-process<br>
''NOTE: Run ended early due to ionizer tube failure.''
''NOTE: run ended early due to ionizer tube failure''
| 8π
| 8π
|  
|  
Line 87: Line 88:
HP&nbsp;Ta&nbsp;#32<br>
HP&nbsp;Ta&nbsp;#32<br>
TM4/ITE
TM4/ITE
| 05/03–05/12
| 05/03–05/<del>12</del>17
| S1147
| S1147
| Investigation of low-lying resonances in <sup>11</sup>Li
| Investigation of low-lying resonances in <sup>11</sup>Li<br>
''NOTE: run extended due to cyclotron problems; rates well above agreed minimum''
| TUDA-II
| TUDA-II
|
| align="center" style="background-color:#ccffcc" | &#x2713;
|
|
|  
|  


|-
|-
| 05/12–05/14
| 05/<del>12–05/14</del>19
| Development
| Development
| TRILIS east path development
| TRILIS east path development<br>
''NOTE: delayed to accommodate extended S1147 run''
| Yield
| Yield
|
| align="center" style="background-color:#ccffcc" | &#x2713;
|
|
|
|
Line 114: Line 117:


|-
|-
| 05/19–05/25
| 05/19–05/<del>25</del>31
| βNMR
| βNMR
| TBA
| Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers (M1153); <sup>8</sup>Li Investigation of Spin Transport through Ferromagnet-Semiconductor (M1176); Investigation of the Magnetic Proximity Effect by <sup>8</sup>Li βNMR (M1165)
| βNMR
| βNMR
|
|
Line 125: Line 128:
| <del>05/25–05/31</del>
| <del>05/25–05/31</del>
| <del>S1142</del>
| <del>S1142</del>
| <del>Study of two-phonon octupole excitations in <sup>146</sup>Gd from the decays of <sup>146</sup>Tb isomers</del> ''CANCELLED by Science Division—isobaric contaminant''
| <del>Study of two-phonon octupole excitations in <sup>146</sup>Gd from the decays of <sup>146</sup>Tb isomers</del> ''CANCELLED BY SCIENCE DIVISION—isobaric contaminant''
| <del>8π</del>
| <del>8π</del>
|
|

Latest revision as of 13:31, 1 June 2010

Past scorecards can be found here.

ISAC RIB (2010)

Schedule 117

Target Dates Experiment

number

Title Facility Pass Fail Incomplete

HP Ta #31
TM3/ITW

03/27–03/30 Development 28–32Al beams with TRILIS Yield
03/30–04/06 S1155 Ground State Moments of 11Li

NOTE: 8,9Li delivered successfully; 11Li rate less than required

β-NQR
04/07–04/12 M1226 Beta-NMR investigation of the magnetism at the interface between insulating SrTiO3 and LaAlO3

NOTE: significant downtime due to power bump and cyclotron problems

β-NQR
04/12–04/14 Development 110–117Ag beam development with TRILIS Yield
04/14–04/20 S1007 Equilibrium of 115mCd during the s-process

NOTE: run ended early due to ionizer tube failure

04/20–04/23 S984 Fast lifetime measurements with the 8π spectrometer and nuclear structure below N=82 CANCELLED—ionizer tube failure X
04/23–04/27 M1153 Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers CANCELLED—ionizer tube failure β-NMR X

HP Ta #32
TM4/ITE

05/03–05/1217 S1147 Investigation of low-lying resonances in 11Li

NOTE: run extended due to cyclotron problems; rates well above agreed minimum

TUDA-II
05/12–05/1419 Development TRILIS east path development

NOTE: delayed to accommodate extended S1147 run

Yield
05/14–05/18 S1203 Spectroscopy of 12Li CANCELLED—target startup delayed by cyclotron problems; S1147 extended to completion TUDA-II X
05/19–05/2531 βNMR Microscopic Investigations by β-NMR of Proximity Effects in Metal Superconductor Bilayers (M1153); 8Li Investigation of Spin Transport through Ferromagnet-Semiconductor (M1176); Investigation of the Magnetic Proximity Effect by 8Li βNMR (M1165) βNMR
05/25–05/31 S1142 Study of two-phonon octupole excitations in 146Gd from the decays of 146Tb isomers CANCELLED BY SCIENCE DIVISION—isobaric contaminant