TRIUMF contacts: Difference between revisions
Jump to navigation
Jump to search
Spencerkiy (talk | contribs) |
Spencerkiy (talk | contribs) |
||
Line 49: | Line 49: | ||
==== General support ==== | ==== General support ==== | ||
*Infrastructure – [http://www.triumf.ca/profiles/ | *Infrastructure – [http://www.triumf.ca/profiles/5004 Matt McClean] (Group Leader, Building Services), [http://www.triumf.ca/profiles/658 Doug Preddy] (Group Leader, Beamlines) | ||
*Engineering and design – [http://www.triumf.ca/profiles/181 Remy Dawson] (ALD – Engineering) | *Engineering and design – [http://www.triumf.ca/profiles/181 Remy Dawson] (ALD – Engineering) | ||
*Safety approval – [http://www.triumf.ca/profiles/2543 Jens Dilling] (ALD – Physical Sciences) | *Safety approval – [http://www.triumf.ca/profiles/2543 Jens Dilling] (ALD – Physical Sciences) |
Revision as of 15:21, 4 October 2019
Beam-Delivery-Updates
It is highly recommended for anyone running an experiment at TRIUMF to subscribe to the beam-delivery-updates e-mail list. Timely updates on anything affecting the beam schedule are sent out to this list.
Subscribe here: http://lists.triumf.ca/mailman/listinfo/beam-delivery-updates
Physical Sciences Division
- Division office – e-mail (New experiment numbers, etc.)
- Associate Lab Director – Jens Dilling
- Administrative Assistant – Allayne McGowan
Life Sciences Division
- Division office – e-mail (New experiment numbers, etc.)
- Associate Laboratory Director – Paul Schaffer
- Administrative Assistant – Gloria Botelho
Accelerator Division
- Associate Laboratory Director – Oliver Kester
- Administrative Assistant – Silke Bergelt-Bruckner
Support groups
Accelerator Operations
- Deputy Department Head – Friedhelm Ames
- Manager – Violeta Toma
Stable Sources
- Group Leader – Keerthi Jayamanna
Science Technology
- Department Head – Fabrice Retiere
- Engineering/construction – Robert Henderson
- Development – Fabrice Retiere
- Electronics – Leonid Kurchaninov
- Data Acquisition – Pierre Amaudruz
- Electronics development – Daryl Bishop
Computing
- Core Computing and Networking – website
- All requests for computing services (user IDs, accounts, etc.) should be made through the TRIUMF HelpDesk.
General support
- Infrastructure – Matt McClean (Group Leader, Building Services), Doug Preddy (Group Leader, Beamlines)
- Engineering and design – Remy Dawson (ALD – Engineering)
- Safety approval – Jens Dilling (ALD – Physical Sciences)
- Beam delivery – Friedhelm Ames (Group Leader, Beam Delivery & Development)
Meson Hall
Beamline, channel and facility coordinators
- M9, M15, M20 – Syd Kreitzman (Department Head, MMS Facility)
- M11 – Stan Yen (Research Scientist)
- PIF, NIF, and TNF (Proton and Neutron Irradiation Facilities and the Thermal Neutron Facility) – Mike Trinczek (Facility Coordinator, PIF/NIF)
- STF (Solid Target Facility) – Jozef Orzechowski (Radioisotope Production Facility Manager)
- 500 MeV Irradiation Facility – Gabriel Cojocaru (Group Leader, ATG Cyclotron Operations)
- UCN – Larry Lee (UCN Project Manager)
ISAC
- Off-Line Ion Source (OLIS), stable beams – Keerthi Jayamanna (Group Leader, Stable Sources)
- Targets/Ion Sources, radioactive ion beam development – Friedhelm Ames (Group Leader, Beam Delivery & Development), Peter Kunz (Actinide Target and RIB Physicist), Jens Lassen (Laser Ion Source Spectroscopist)
- Front end and low-energy beam transport – Friedhelm Ames (Group Leader, Beam Delivery & Development), Suresh Saminathan (Beam Physicist), Brad Schultz (ISAC Low Energy Beam Development)
- Accelerators and high-energy beam transport – Marco Marchetto (ISAC High Energy Facility Coordinator), Bob Laxdal (Department Head - RF/SRF), Spencer Kiy (Beam Delivery Coordinator)
- Experimental facility support – Martin Alcorta (ISAC Detector and Target Physicist)
- Beam delivery – Friedhelm Ames (Group Leader, Beam Delivery & Development), Spencer Kiy (Beam Delivery Coordinator), Brad Schultz (ISAC Low Energy Beam Development)
ISAC comprises two experimental halls with a broad range of facilities.
Each facility has a local Facility Coordinator who is responsible for the safe operation of the facility and will act as a user and visitor liaison.
Interested scientists should contact the appropriate Coordinator from the lists below to obtain more information.
ISAC low-energy experimental facilities
- Implantation Station – Peter Kunz
- Yield Station – Peter Kunz
- Polarizer – Phil Levy
- βNMR and βNQR – Gerald Morris
- GRIFFIN – Adam Garnsworthy
- GPS – Adam Garnsworthy
- OSAKA – Matt Pearson
- Radon EDM – Matt Pearson
- TITAN – Anna Kwiatkowski
- TRINAT – John Behr
- Francium Trap – John Behr
- Laser Spectroscopy – Matt Pearson
ISAC-I (accelerated) experimental facilities
- HEBT general purpose location – Adam Garnsworthy
- DRAGON – Chris Ruiz
- TUDA-I – Chris Ruiz
- TACTIC – Chris Ruiz
ISAC-II experimental facilities
- SEBT general purpose location – Martin Alcorta
- TUDA-II – Martin Alcorta
- HERACLES – Martin Alcorta
- DSL – Martin Alcorta
- IRIS – Martin Alcorta
- TIGRESS – Greg Hackman
- EMMA – Barry Davids
The official lists of facility coordinators are available on TRIUMF's documents server (TRIUMF Secure Access ID required):
- Accelerator Division Facility Coordinators (PDF, 94 kB)
- Science Division Facility Coordinators (PDF, 68 kB)