TRIUMF contacts: Difference between revisions
Jump to navigation
Jump to search
(→ISAC) |
|||
Line 96: | Line 96: | ||
*SEBT1: [http://tuda.triumf.ca/ TUDA-II], [http://www.triumf.ca/tug/agm2000/HERACLES.html HERACLES] – [http://www.triumf.ca/profiles/2360 Colin Morton] | *SEBT1: [http://tuda.triumf.ca/ TUDA-II], [http://www.triumf.ca/tug/agm2000/HERACLES.html HERACLES] – [http://www.triumf.ca/profiles/2360 Colin Morton] | ||
*SEBT2 | *SEBT2: GPS, DLS, IRIS – [http://www.triumf.ca/profiles/2360 Colin Morton] | ||
*SEBT3A: [http://tigress.triumf.ca/ TIGRESS] – [http://www.triumf.ca/profiles/3154 Greg Hackman] | *SEBT3A: [http://tigress.triumf.ca/ TIGRESS] – [http://www.triumf.ca/profiles/3154 Greg Hackman] | ||
*SEBT3B: [http://davids.triumf.ca/emma.htm EMMA] (<font color=red>Under construction</font>) – [http://www.triumf.ca/profiles/3508 Barry Davids] | *SEBT3B: [http://davids.triumf.ca/emma.htm EMMA] (<font color=red>Under construction</font>) – [http://www.triumf.ca/profiles/3508 Barry Davids] |
Revision as of 16:09, 27 May 2013
Science Division
- Science Division office – e-mail (New experiment numbers, etc.)
- Administrative Assistant – Nicole Martin
- Division Head – Reiner Kruecken
Computing
- Core Computing and Networking – website
- All requests for computing services (user IDs, accounts, etc.) should be made through the TRIUMF HelpDesk.
Nuclear Medicine Division
- Division Head – Jean-Michel Poutissou
Support groups
Accelerator Operations
- 520 MeV Cyclotron Operations Coordinator – Jamie Cessford
- ISAC Operations Coordinator – Violeta Toma
- TR13 PET Operations Coordinator – Conny Hoehr
Stable Sources
- Group Leader – Keerthi Jayamanna
Detectors
- Detector Group Leader – Andy Miller
- Engineering/Construction – Robert Henderson
- Vacuum chambers – Wayne Faszer
- Gas handling – Robert Openshaw
- Instrumentation – Grant Sheffer
Data acquisition and analysis
- Data Acquisition Group Leader – Pierre Amaudruz
- Counting rooms – Meson Hall coordinator: Grant Sheffer; ISAC coordinator: Pierre Amaudruz
General support
- Infrastructure – Curtis Ballard (Group Leader, Site Maintenance Services), Doug Preddy (Group Leader, Beamlines Support)
- Engineering and design – Remy Dawson (Division Head, Engineering)
- Safety approval – Reiner Kruecken (Division Head, Science)
- Beam delivery – Colin Morton (Beam Delivery Group Liaison/Coordinator)
Meson Hall
Beamline, channel and facility coordinators
- M9, M15, M20 – Syd Kreitzman (Group Leader, MMS Facility)
- M11 – Stan Yen (Research Scientist)
- M13 – Andy Miller (Group Leader, Detector Group)
- PIF, NIF, and TNF (Proton and Neutron Irradiation Facilities and the Thermal Neutron Facility) – Mike Trinczek (Facility Coordinator, PIF/NIF)
- STF (Solid Target Facility) – Jozef Orzechowski (Radioisotope Production Facility Manager)
- 500 MeV Irradiation Facility – Gabriel Cojocaru (Group Leader, ATG Cyclotron Operations)
ISAC
- Off-Line Ion Source (OLIS), stable beams – Keerthi Jayamanna (Group Leader, Stable Sources)
- Targets/Ion Sources, radioactive ion beam development – Pierre Bricault (Group Leader, currently on sabbatical), Peter Kunz (Actinide Target and RIB Physicist), Jens Lassen (Laser Ion Source Spectroscopist)
- Front end and low-energy beam transport – Friedhelm Ames (Group Leader, ISAC Facility Support), Colin Morton (Beam Delivery Group Liaison/Coordinator)
- Accelerators and high-energy beam transport – Marco Marchetto (ISAC High Energy Facility Coordinator), Bob Laxdal (Group Leader, RF/SRF)
- Beam delivery – Colin Morton (Beam Delivery Group Liaison/Coordinator)
ISAC comprises two experimental halls with a broad range of facilities.
Each facility has a local Facility Coordinator who is responsible for the safe operation of the facility and will act as a user and visitor liaison.
Interested scientists should contact the appropriate Coordinator from the lists below to obtain more information.
ISAC low-energy experimental facilities
- Collection Station – Friedhelm Ames
- Yield Station – Peter Kunz
- Polarizer – Phil Levy
- βNMR and βNQR – Gerald Morris
- 8π – Adam Garnsworthy
- ILE1C-GPS – Adam Garnsworthy
- OSAKA – Matt Pearson
- Radon EDM – Matt Pearson
- TITAN – Jens Dilling
- TRINAT – John Behr
- Francium Trap – John Behr
- Laser Spectroscopy – Matt Pearson
ISAC-I (accelerated) experimental facilities
- HEBT: ISAC-I general purpose location – Adam Garnsworthy
- HEBT2: DRAGON – Chris Ruiz
- HEBT3: TUDA-I, TACTIC – Lothar Buchmann
ISAC-II experimental facilities
- SEBT1: TUDA-II, HERACLES – Colin Morton
- SEBT2: GPS, DLS, IRIS – Colin Morton
- SEBT3A: TIGRESS – Greg Hackman
- SEBT3B: EMMA (Under construction) – Barry Davids
The official lists of facility coordinators are available on TRIUMF's documents server (TRIUMF Secure Access ID required):
- Accelerator Division Facility Coordinators (PDF, 94 kB)
- Science Division Facility Coordinators (PDF, 68 kB)