ISAC RIB (2010)
Schedule 117
Target | Dates | Experiment
number |
Title | Facility | Pass | Fail | Incomplete |
---|---|---|---|---|---|---|---|
HP Ta #31 |
03/27–03/30 | Development | 28–32Al beams with TRILIS | Yield | |||
03/30–04/06 | S1155 | Ground State Moments of 11Li | β-NQR | ||||
04/07–04/12 | M1226 | Beta-NMR investigation of the magnetism at the interface between insulating SrTiO3 and LaAlO3 NOTE: Significant downtime due to power bump and cyclotron problems. |
β-NQR | – | |||
04/12–04/14 | Development | 110–117Ag beam development with TRILIS | Yield | ||||
04/14–04/20 | S1007 | Equilibrium of 115mCd during the s-process NOTE: Run ended early due to ionizer tube failure. |
8π | – | |||
X | |||||||
X | |||||||
HP Ta #32 |
05/03–05/12 | S1147 | Investigation of low-lying resonances in 11Li | TUDA-II | |||
05/12–05/14 | Development | TRILIS east path development | Yield | ||||
X | |||||||
05/19–05/25 | βNMR | TBA | βNMR | ||||